Pages

Sunday, January 27, 2013

Adepticon 2013 Hastings Redux Terrain | pt 5

Mark has gotten more work done on the main bridge... [and just to set the record straight, all this lovely work is being done by Mark, I (mike) just help think some stuff up and help with the blogging...]
Lift out bridge in place with stone ramps to blend it into the terrain board. 
None shall pass!  Well good luck with that... 




River board test fitting with neighboring section. Looking good.


Mark has a lot of thing going on... Much of this will end up on the Hastings Table.


and he has tubs of terrain!  Mark is out of control, just saying...


Some more the buildings Mark has assembled and based, some you'll see at Adepticon.


Thanks for looking
-Mark and Mike

2 comments: